Sukkur–Multan Motorway (M-5) Sections 4, 5 & 6

Sukkur–Multan Motorway (M-5) Sections 4, 5 & 6

Design review and construction supervision for 162 km of the M-5 Motorway under CPEC.

CategoryMotorways & Highways
Location

Punjab, Pakistan

Timeline

2016–2019

Value

PKR 510.74M (Combined Consulting Services)

Sukkur–Multan Motorway (M-5) Sections 4, 5 & 6 - Image 1
1 / 3

Project Overview

ESS-I-AAR provided the complete design review and resident construction supervision services for Sections 4, 5 and 6 of the 392 km Sukkur–Multan Motorway (M-5), a flagship component of CPEC. Scope included PC-1 validation, structural review, ITS design integration, and full contract administration for a cumulative 162 km segment of high-speed (120 km/h), controlled-access motorway infrastructure.

ClientChina State Construction Engineering Corporation (CSCEC)

Technical Information

Combined (Supervised) Length: 162 Km
6-Lane
48 Bridges
4 Interchanges
99 Subways
54 Underpasses
3 Rest Areas
4 Toll Plazas
509 Pipe Culverts
216 Box Culverts
120 Cattle Creeps
Intelligent Transportation Systems (ITS)
Total M-5 Project (Context): 392 km total
Speed: 120 km/h
54 bridges (inc. Major River Sutlej bridge)
12 service areas
10 rest areas
12 interchanges
10 flyovers
426 underpasses

Scope of Work

Design Review and PC-1 Update
Resident Construction Supervision and Contract Administration
Quality Control and Compliance Monitoring
Roughness Survey and Reporting
Monthly, Annual, Interim and Final Reporting

Key Features

1
162 km total length (54 km × 3 sections)
2
Part of Peshawar–Karachi Motorway (CPEC)
3
Bridges, flyovers, underpasses and culvert structures
4
Toll plazas, rest/service areas, and ITS systems

Detailed Route Narrative

1.Section-4 (Zahir Pir - Khanpur)

Includes 24 bridges, 2 interchanges, and 197 pipe culverts.

Length: 54 Km

2.Section-5 (Taranda M Panah / Ahmadpur Sharqiya)

Includes 12 bridges, 1 interchange, and 60 cattle creeps.

Length: 54 Km

3.Section-6 (Shujaabad / Jalalpur Pirwala)

Includes 12 bridges, 1 interchange, and 156 pipe culverts.

Length: 54 Km

Challenges Overcome

Large-scale stakeholder coordination
High-volume structural supervision across multiple sites
Infrastructure Engineering CTA Background

Let’s build what’s next.

We help deliver infrastructure that moves nations forward — with 65+ years of trusted engineering.

400+Projects Completed
65+Years Experience
500+Professionals